Modifications were needed to expand the Birchwood Landfill to increase capacity. The expansion required site preparation including clearing, grubbing, 1.1 million cubic yards of mass excavation and grading to subgrade elevation, followed by recompacted soil and geosynthetic liner construction.
Engineering services were performed to comply with Tennessee Solid Waste Management regulations related to lining and opening the 50-acre municipal solid waste landfill (Class I). Several sedimentation/detention basins with associated ditches, piping, and outfall structures were installed. A 20-acre cell was constructed with a two-foot-thick clay liner, geomembrane, and leachate collection system.
Client
City of Chattanooga
Project Cost
$9.2M
Funding
Local
CTI Personnel on project
Taylor Stein, PE
Gary Cosby, PE
Ron Key, PE