SUMMARY
Phase 1 includes approximately 2,000 LF of 8-inch PVC gravity sewer, 4,500 of 4-inch service line, a 100-gpm submersible duplex pump station plus 1,550 LF of 4-inch force main. Phase 2 includes 2,000 LF of 8-inch and one mile of service line. Phase 3 includes 2,500 LF of 8-inch, 850 LF of 10-inch sewer, and 4,100 LF of service line. A 60-inch by 38-inch reinforced concrete elliptical culvert was also installed across one of the County’s busiest roads. Phase IV includes 3,400 LF of 8-inch sewer and 6,218 LF of service line.
PROJECT ELEMENTS
- Over 10,750 LF of 8-inch and 10-inch gravity sewer within residential roads
- 100-gpm submersible duplex pump station and 1,550 LF of 4-inch force main
- Installation of over 13,800 LF of service line and LMI house connections
- Site restoration and road repair
- 60-by-38-inch culvert
SERVICES PROVIDED BY CTI PERSONNEL
- Funding application assistance
- Hydraulic modeling
- Easement assistance
- Permitting
- Planning, design and CAD drawings
- Bidding assistance
- Construction phase services
- Resident project representation
- Coordination with City of Chattanooga, City of Fort Oglethorpe, Catoosa County, Georgia EPD, NRCS, DCA and GEFA