Water Line Replacements and Interconnection

Benton, Tenn.

PROJECT SUMMARY

In addition to needing to secure a second source of water, the Town's water system contains older water lines constructed of transite (AC) and iron that have experienced continunal breaks/leaks.

PROJECT ELEMENTS

  • Construction of a metered interconnection with Etowah Utilities
  • Replacing approximately 6,300 LF of existing 2-inch and 8-inch water line with 8-inch and 10-inch water line
  • Operations building and site piping upgrades

SERVICES PROVIDED BY CTI PERSONNEL

  • Preliminary engineering
  • Permitting
  • Design and specifications
  • Construction administration
  • Resident project representation
Project Description

Having a single pump and well, the Town of Benton needed a second source of water. After attempts to construct a second well, the Town deemed it more economically feasible to install an interconnection with a neighboring utility.

Project Details
  • Client: Town of Benton, Tenn.